Dalian comprehensive renovation of the city’s 843 coal-fired boilers-www.haole15.com

The city of Dalian 843 coal-fired boilers to carry out comprehensive improvement for the full implementation of the work meeting of the leading group, the blue sky project spirit, and improve the quality of atmospheric environment in our city, from now on, Dalian to carry out air pollution control hundred day battle, focus on strengthening the comprehensive improvement of coal boiler, the yellow car out, dust control, straw Jinshao work in the media, regularly informed of progress of coal-fired boilers and other work, criticized the serious impact on the progress of atmospheric pollution control work in our city, and the work of the implementation of the municipal government of the district county government as the atmospheric control action plan assessment. Focus on the following four tasks: one is to strictly control coal pollution. Comprehensive renovation of 843 coal-fired boilers in the urban area (including the province by the removal of 115 coal-fired boiler), must be completed before the end of October; strengthen the heating period of coal quality supervision and inspection, to avoid inferior coal burning caused serious air pollution; two is the strict control of motor vehicle pollution. To ensure completion before the end of 40705 yellow car out of public security; environmental protection, strengthen cooperation, carry out special inspection of law enforcement activities, illegal vehicle inspection of key black smoke vehicles, pollution prevention and control into the limit line area, strict vehicle inspection; three is the strict control of dust pollution, increase construction, transportation and other large yard dust dust pollution source supervision and inspection. Clear the responsibilities of departments, environmental protection departments responsible for the unified supervision and inspection in dust supervision; strengthen the daily supervision, classified listing, quantitative assessment carried out; to strengthen territorial responsibility, road dust and other key and difficult work of supervision; four is to strictly control the burning of straw. The establishment of district county government (the pilot zone), township and village streets, straw burning four grid system, layers of implementation, the responsibility to the people; to strengthen inspections of straw burning behavior timely investigation, strictly control the burning straw of autumn and winter. As the battle started, and improve the quality of atmospheric environment in our city, this work adopts a regular reporting system. The blue sky project all relevant units in a timely manner in every half month, blue sky; blue sky blue sky to the provincial office office, and regularly informed of progress around the coal-fired boiler work in the media, criticism of the working poor, affect the progress report. At the same time, this work included in the municipal government of the district county government (the pilot zone) atmospheric control action plan assessment. Reporter Wu Yaohui

大连对市内843台燃煤锅炉进行综合整治   为全面贯彻落实省蓝天工程领导小组第二次工作会议精神,切实改善我市大气环境质量,从即日起,大连开展大气治理百日攻坚战,重点加强煤锅炉综合整治、黄标车淘汰、扬尘管控、秸秆禁烧等工作,定期在媒体通报燃煤锅炉等工作进展情况,对严重影响我市大气污染治理工作进展的单位通报批评,并将上述工作贯彻执行情况作为市政府对区市县政府大气防治行动计划考核内容。   重点开展以下四项工作:一是严控燃煤污染。市区内843台燃煤锅炉综合整治(包括省下达的115台燃煤锅炉拆除任务),10月底前必须完成;强化采暖期用煤质量监督检查,避免燃烧劣质煤造成严重大气污染;二是严控机动车污染。确保年底前完成40705辆黄标车淘汰;环保、公安加强配合,开展专项执法检查活动,重点检查冒黑烟车辆、进入污染防治限行区域的违规机动车,严格机动车环保检测;三是严控扬尘污染,加大施工、交通以及堆场等大型尘源扬尘污染监督检查力度。明确部门职责,环保部门在扬尘监管中负责统一监督、检查;加强日常监管,将分类挂牌、量化考核落到实处;强化属地责任,做好道路扬尘等重点、难点工作监管;四是严控秸秆焚烧。建立区市县政府(先导区管委会)、乡、村、街道秸秆焚烧四级网格制度,层层落实,责任到人;加强巡查,对秸秆焚烧行为及时查处,严控秋末冬初秸秆焚烧。   为打响此次战役,切实改善我市大气环境质量,此项工作采取定期通报制度。蓝天工程各有关单位及时将工作进展情况每半个月报市蓝天办;市蓝天办按期报省蓝天办,并定期在媒体上通报各地燃煤锅炉等工作进展,对工作不力、影响进展的通报批评。同时,此项工作纳入市政府对区市县政府(先导区管委会)大气防治行动计划考核内容。   记者吴耀辉相关的主题文章: